Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a sidewalk / parking lot in Brunswick, Maine. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The Androscoggin Brunswick-Topsham Riverwalk will cover a 1.25 mile loop starting in Brunswick at the corner of Maine and Cabot Streets in front of Fort Andross. It will run along Cabot Street to Bow Street to Mill Street (Route One Blue Star Memorial Highway) to the Androscoggin Swinging Bridge located near the intersection of Mill and Cushing Streets. On the Swinging Bridge, the Riverwalk will cross the Androscoggin River to Topsham near the intersection of Union and Bridge Streets in Topsham. It will follow Mill Road, a "paper" street along the riverbank to Summer Street. The Riverwalk will run along Summer Street to the rear of the Border Trust Business Center at 2 Main Street. From there it will connect with a semicircular overlook with stairs located between the Border Trust parking lot and the river. It will then intersect with Maine Street (Route 24) via the Frank Wood Bridge. The loop will be completed at the Maine and Cabot streets in Brunswick, in front of Fort Andross. This particular project will involve all improvements along Mill Street from the Androscoggin Swinging Bridge to Maine, Cabot and Bow Streets near Fort Andross. The Council previously voted to submit an application for Maine Department of Transportation Quality Community Program, and in February 2017 $64,000 in funding was approved for a feasibility study and possible preliminary design of a multi-use pathway connecting the Swinging Bridge to the Frank J. Wood Bridge. The $16,000 match was provided by the Riverwalk Committee through their fundraising efforts. A copy of the application is on file in the Director of Parks and Recreation office which details the full scope of the project. The scope of the project will be affected by the renovation or replacement of the Frank Wood Bridge and the Reconstruction of the Pool Table. This project is currently in development by MDOT, and is expected to address pedestrian and bicycle access across the full span and on the approach to the Brunswick end of the bridge. There may be some cost savings of Brunswick's share of the overall project cost dependent upon where the MDOT bridge project improvements extend south onto Maine Street. As of July 24, 2024, this project is currently in the FY 2025-2029 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2025-2027. Further information regarding a design firm or detailed construction timeline has not been made available. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Sidewalks / Parking Lot
$1,025,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2026
Mill St, Brunswick, ME
Related To This Project
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
Bid Date: Jul 26 2024
Brunswick, ME
Bid Date: Jul 16 2024
Brunswick, ME
--
Brunswick, ME
Bid Date: May 15 2024
Brunswick, ME
--
Brunswick, ME
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.