Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Elkton, Maryland. Completed plans call for the renovation of a educational facility.
The school's current HVAC system is from 1995 when the building was renovated. This project consists of an entirely new system to replace boilers, pumps, miscellaneous boiler room appurtenances, and boiler room controls as well as replace facility-wide pneumatic controls with DDC controls. Replace terminal HVAC equipment including RTU's, MUA, unit heaters, unit ventilators, fan coil units, VAV boxes, and exhaust fans, and replace classroom unit ventilators with vertical unit ventilators and supply ductwork. Replace air-cooled chiller with air-cooled split system chiller as well as replace the domestic hot water heater with new commercial gas-fired hot water heater. The kindergarten addition from 2005 is not included in the scope of work. The contractor or supplier who provides materials, supplies, equipment, and/or services for this construction project must attempt to achieve the specific overall MBE goal of 7 percent established for this project. All prime contractors, including certified MBE firms, when submitting bids or proposals as general or prime contractors, are required to attempt to achieve this goal from certified MBE firms. In addition, a 5 percent Bid Bond, Anti-Bribery Affidavit, Certification Regarding Debarment, NonCollusion Affidavit, and Contractor's Qualification Statement (AIA Document A305) must accompany all bids. A 100 percent Performance and Payment Bond payable to the Owner and certification of appropriate insurance coverage will be required of the successful Bidder. Questions regarding this bid may be sent and received by e-mail only by Noon, March 18, 2022, to Kay Porter, Assistant in Purchasing, Purchasing Department, Cecil County Public Schools at procurement@ccps.org. An acknowledgment of receipt of the e-mail request will be sent by return e-mail to the sender. Responses to the questions will be addressed in an addendum and posted by March 21, 2022, on eMaryland Marketplace Advantage (eMMA) - procurement.maryland.gov.
Post-Bid
Educational
$2,438,000.00
Public - County
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 30, 2022
May 30, 2022
971 Elk Mills Rd, Elkton, MD
Related To This Project
Elkton, MD
Bid Date: May 04 2022
Elkton, MD
Bid Date: Mar 22 2022
Elkton, MD
Bid Date: May 26 2022
Elkton, MD
Bid Date: May 26 2022
Elkton, MD
Bid Date: Apr 07 2023
Elkton, MD
Bid Date: May 04 2022
Elkton, MD
Bid Date: May 04 2022
Elkton, MD
Bid Date: May 03 2022
Elkton, MD
Bid Date: Jan 26 2023
Elkton, MD
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction leads in the industry. Period.
Get instant access to five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.