Site work and new construction of a transportation facility in Lees Summit, Missouri. Completed plans call for the construction of a 10,600-square-foot transportation facility; and for site work for a transportation facility.

This project is for the design and construction of a new terminal building to be constructed as part of the east side terminal area development. This project is eligible for ATP Funds thru the Bipartisan Infrastructure Law. The Airport Master Plan Update includes a modern terminal building as part of the east side development. The new facility will include modern day design and material considerations. It will also enable the future relocation of the remainder of Parallel Taxiway A to meet C-II design. The project consists of a new approximately 10,600 square foot single-story building with mezzanine as part of the planned Eastside Development of Kansas City-Lee's Summit Regional Airport. Structural components include slab-on-grade, structural steel frame, open-web steel joists, metal decking, and both membrane and standing-seam metal roofing. Architectural components include face brick and composite metal wall panels, insulated glass storefront, gypsum board systems, specialty suspended ceiling systems, acoustical wall panels, plastic-laminate casework, quartz countertops, epoxy terrazzo flooring, resinous flooring, carpet tile, ceramic wall tile, paint, custom millwork. Furniture is owner-provided. Civil components include mass excavation, site utilities, paving, landscaping. Mechanical components include a roof-top unit with ducted, zoned VAV's. Plumbing components include restroom, break room, line service, and custodial fixtures, and roof drains. Electrical components include a photovoltaic rooftop array, light fixtures, data and power. Audio/Visual includes systems for conference rooms, televisions, speakers for mass notification. The project is included in the City's 2026-2030 Capital Improvement Program (CIP). As of July 30, 2025, construction bids were due June 9, 2025. Awaiting awarded contractor. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Post-Bid

Transportation Terminals

$10,767,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
94
Bidding Soon
1,180
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2025

June 30, 2026

Project location map

2751 NE Douglas St, Lees Summit, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.