Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 13, 2025 at 8:00 PM
Updated June 14, 2025
Site work and paving for a civil project in San Marcos, Texas. Design plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.
UPDATE : Wallace Addition Subdivision drainage and streets exceed their useful life cycle in FY 2015. Wallace Addition Water & Wastewater project started with replacing existing aged and sagging wastewater and water lines. In 2018, Wallace Addition drainage improvements feasibility study was initiated to identify improvements required to mitigate flooding. Both on-site and off-site drainage improvements including curb inlets, storm trunk line, channel improvements and box culverts are recommended. On-site drainage improvements will be constructed with Wallace Addition Subdivision improvements project, while off-site improvements will be constructed as part of a separate project i.e. “Wallace Addition Off-site Drainage Improvements”. Water and wastewater lines will be replaced and streets will be reconstructed with sidewalks within the neighborhood. Additional funding is required to replace water and wastewater lines, install new drainage system, and roadway reconstruction. Department Responsible For Project: Engineering/CIP Strategic Initiative(s): Stormwater, Multi-Modal Transportation Project is in City of Alexandria capital budget fy 2025-2034 CIP 102 ____________________________________________________________________________ Update : https://tinyurl.com/4kvb26my Wallace Addition Water & Wastewater project started with replacing existing aged and sagging wastewater and water lines. In 2018, Wallace Addition drainage improvements feasibility study was initiated to identify improvements required to mitigate flooding. Both on-site and off-site drainage improvements including curb inlets, storm trunk line, channel improvements and box culverts are recommended. On-site drainage improvements will be constructed with Wallace Addition Subdivision improvements project, while off-site improvements will be constructed as part of a separate project i.e. "Wallace Addition Off-site Drainage Improvements". Water and wastewater lines will be replaced and streets will be reconstructed with sidewalks within the neighborhood. Additional funding is required to replace water and wastewater lines, install new drainage system, and roadway reconstruction. Project is included City of San Marcos FY 2024-2033 Page No 172 --------------------------------------------------------------------------------------------------------------------------------------------------- Project is included City of San Marcos 2018-2027 CIP. As of October 2020, the project is in design and expected to be completed in July 2025, with bidding to follow in October 2025. Construction is anticipated to be completed in September 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Water / Sewer
$12,400,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2027
Multiple Locations, San Marcos, TX
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
