Site work and paving for a civil project in San Marcos, Texas. Design plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

UPDATE : Wallace Addition Subdivision drainage and streets exceed their useful life cycle in FY 2015. Wallace Addition Water & Wastewater project started with replacing existing aged and sagging wastewater and water lines. In 2018, Wallace Addition drainage improvements feasibility study was initiated to identify improvements required to mitigate flooding. Both on-site and off-site drainage improvements including curb inlets, storm trunk line, channel improvements and box culverts are recommended. On-site drainage improvements will be constructed with Wallace Addition Subdivision improvements project, while off-site improvements will be constructed as part of a separate project i.e. “Wallace Addition Off-site Drainage Improvements”. Water and wastewater lines will be replaced and streets will be reconstructed with sidewalks within the neighborhood. Additional funding is required to replace water and wastewater lines, install new drainage system, and roadway reconstruction. Department Responsible For Project: Engineering/CIP Strategic Initiative(s): Stormwater, Multi-Modal Transportation Project is in City of Alexandria capital budget fy 2025-2034 CIP 102 ____________________________________________________________________________ Update : https://tinyurl.com/4kvb26my Wallace Addition Water & Wastewater project started with replacing existing aged and sagging wastewater and water lines. In 2018, Wallace Addition drainage improvements feasibility study was initiated to identify improvements required to mitigate flooding. Both on-site and off-site drainage improvements including curb inlets, storm trunk line, channel improvements and box culverts are recommended. On-site drainage improvements will be constructed with Wallace Addition Subdivision improvements project, while off-site improvements will be constructed as part of a separate project i.e. "Wallace Addition Off-site Drainage Improvements". Water and wastewater lines will be replaced and streets will be reconstructed with sidewalks within the neighborhood. Additional funding is required to replace water and wastewater lines, install new drainage system, and roadway reconstruction. Project is included City of San Marcos FY 2024-2033 Page No 172 --------------------------------------------------------------------------------------------------------------------------------------------------- Project is included City of San Marcos 2018-2027 CIP. As of October 2020, the project is in design and expected to be completed in July 2025, with bidding to follow in October 2025. Construction is anticipated to be completed in September 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Water / Sewer

$12,400,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
4
Bidding Soon
1,525
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.