BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and new construction of a parking garage in Arlington, Texas. Completed plans call for the construction of a five-story above grade, 1,500-space parking garage.

The University of Texas at Arlington seeks to construct a new cost effective but durable parking garage to provide parking for students, faculty, staff, event patrons, and visitors to the University. The garage will be located on an existing parking lot, Lot 33, at the comer of UTA Boulevard and W. Nedderman Drive, one block west of S. Cooper Street. As envisioned in the university’s approved Campus Master Plan (May 2007), this parking garage will reduce the amount of surface parking lots from 111 acres to 56 acres to make better use of the campus land. This parking garage will be designed with a 1,500 car capacity, including a small UTA Police Department satellite office, and anticipated to be a 5-level parking structure. The garage shall have 9 foot wide parking spaces, and to the fullest extent possible angled spaces to create one-way traffic flow. Ramps may be straight inclined, with two-way traffic and straight-in parking on either side. Respondents should visit the College Park District garages to see examples of this arrangement. Circular (helical) ramps are not preferred. It is anticipated that the elevation facing UTA Boulevard and the elevation fronting W. Nedderman Drive, will include additional architectural elements to “soften” the project’s impact along this edge of the campus, in accordance with the Campus Master Plan. This garage is scheduled to start construction in January of 2017 and be completed within 9-12 months thereafter. The anticipated Construction Cost Limitation (CCL) for this project is $25,260,000. The University realizes there are various design alternatives, including poured-in-place, post tensioned, precast, and/or a hybrid design. The University is looking for the most cost effective design approach to meet the required delivery date.

Occupancy

Parking Garage

$27,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
77
Bidding Soon
3,547
All Active Projects
1,299
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2016

January 4, 2017

img_map_placeholder

1225 W Mitchell St, Arlington, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.