BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Garland, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Sealed bids have a state mandated dollar level. NO FAXED OR EMAILED BIDS! All documents (forms) herein and attached are required to be completed and returned with response. WEST CAMPBELL ROAD TO BOTELLO ROAD Question Deadline 01/23/2024 at 5:00 PM CT Any questions pertaining to this request must be submitted through online, All questions must be answered within the Ion Wave Question & Answer segment. A Bid Bond in the amount of 5% is required with your bid submittal. A Performance, Payment and Maintenance Bond (2 yr.) will be required upon notification of award. Mark Outside of Envelope: RFB 0212-24 CALLEJO ROAD IMPROVEMENTS WEST CAMPBELL ROAD TO BOTELLO ROAD Project No. PWD 2019-027 Click below to join the meeting: Join the meeting https://teams.microsoft.com/l/meetupjoin/19%3ameeting_ZDVmNGYzZTMtMzczYS00MDU3LTgwYTQtOTI2YTliNTBlNzk4%40thread.v2/0 context=%7b%22Tid%22%3a%22dc9bb2bb-da41-49ff-a319- 0a4c689bb4b5%22%2c%22Oid%22%3a%22496e0fe1-2342-483c-9b1a-3437334169df%22%7d Meeting ID: 237 921 970 974 Passcode: 2GiR9w Or Call in (Audio Only): 1 469-480-4587, 182882094# United States, Dallas - Locating existing utilities - Coordinating with Contractors working adjacent to the project limits. - Videotaping of work site prior to construction - Contractor negotiations with property owners for temporary staging areas - Construction staking - Preservation and protection of plant materials and trees, unless specified otherwise on the plans on a case by case basis. - Removing brush and trees smaller than 6". - Additional Barricades and Traffic Control Devices within the project limits to maintain traffic safety - Removing asphalt detour pavement - Repairing asphalt detour pavement - Cutting and plugging existing utility lines to be abandoned - Removal of existing lines in any location or in proposed trench lines - Adjusting water valve stacks, meters, wastewater cleanouts to finished grades - Maintaining positive drainage during all construction phases - Removing valves and fittings - Substituting 5" of non-reinforced concrete for the asphalt detours. - Concrete curb is incidental to concrete pavement. - Field adjusting locations of taps, connections, manholes, junction boxes, driveways, ramps, sidewalks, signs, and other miscellaneous appurtenances due to site changes occurring after bidding of plans. - Painting of steel railings - All fees, unless stated otherwise is this contract - Repairs to driveways, fences, walls, landscaping, irrigation and other private property that is avoidable, caused by the Contractor and not approved in writing by the City. - Field Office - Removing erosion control devices - Final cleanup

Bid Results

Roads / Highways

$10,980,962.00

Public - City

Paving, Site Work

271

21

13

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
67
Bidding Soon
3,558
All Active Projects
1,409
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.