Site work, paving and outdoor lighting for a mixed-use development in Salem, Oregon. Conceptual plans call for site work for a water / sewer project; sidewalk / parking lot; for paving for a sidewalk / parking lot; and for outdoor lighting for a sidewalk / parking lot.

Update:Design and construction of street improvements to arterial street standards, including new curb, sidewalks, multi-use path, stormwater treatment, and streetlights. Includes new traffic signals at 12th St SE, 13th St SE, and 25th St SE, upgrades to two creek crossings, and rail crossing improvements. Project is included in City of Salem Fiscal Year 2026-2030 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update:https://www.cityofsalem.net/home/showpublisheddocument/22647/638860175638630000 Design and construction of street improvements to arterial street standards, including new curb, sidewalks, multi-use path, stormwater treatment, and streetlights. Includes new traffic signals at 12th St SE, 13th St SE, and 25th St SE, upgrades to two creek crossings, and rail crossing improvements. Project is included in City of Salem Fiscal Year 2025-2029 Page no 58 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- https://www.statesmanjournal.com/story/news/local/2023/12/23/salem-oregon-road-construction-projects-2024/71881412007/ Construction has begun on the four-year project to completely revamp McGilchrist Street, one of the city's most important arterial streets. It had as many as 12,900 trips per day, according to city of Salem estimate. Salem received $13.2 million in funding to improve McGilchrist Street SE in Salem. The project in the industrial area just west of Salem's airport is designed to widen the current narrow two-lane road into a three-lane road with sidewalks, a cycle track, a center turn lane and improve railroad and creek crossings. ODOT estimates that the project will cost $32.9 million. The city of Salem says that $50.8 million has been saved for the project, including $13.2 million from a federal RAISE grant. Salem says the first phase, which involves a realignment of McGilchrist with the intersection of 22nd Street and improvements to storm water facilities began in October and is expected to be completed in late 2024. The next two phases, which include improvements from 12th Street to 25th Street, are expected to begin in 2025 and be finished in 2027. __________________________ UPDATE : https://www.cityofsalem.net/home/showpublisheddocument/19420/638300252573700000 Design, right-of-way acquisition, and construction to improve McGilchrist St SE to minor arterial standards with proper travel lane widths, bike lanes, curbs, gutters, sidewalks, and drainage systems. Work also includes replacing stream crossing structures at the east and west forks of Pringle Creek, and the realignment and signalization of 22nd St SE. This project includes federal funding (Key Number 20739) administered by the Oregon Department of Transportation and provides for City match funding and anticipated federal grant reimbursement of City expenses. Project is in City of Salem 2024-2028 CIP Document 55 _______________________________________________________________________________________________________________________ UPDATE: https://www.cityofsalem.net/home/showpublisheddocument/16151/637920313726970000 Design, right-of-way acquisition, and construction to improve McGilchrist St SE to minor arterial standards with proper travel lane widths, bike lanes, curbs, gutters, sidewalks, and drainage systems. This project includes federal funding (RAISE Grant) and provides for City match funding and anticipated federal grant reimbursement of City expenses. RAISE Grant funding for this project is subject to award of grant. For additional McGilchrist St SE improvements see Project Number 0001040. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of August 22, 2022, further details regarding design and construction have not been identified. ________________________________________________________________________ Design, right-of-way acquisition, and construction to improve McGilchrist St SE to minor arterial standards with proper travel lane widths, bike lanes, curbs, gutters, sidewalks, and drainage systems. Work also includes replacing stream crossing structures at the east and west forks of Pringle Creek. This project includes federal funding (Key Number 20739) administered by the Oregon Department of Transportation and provides for City match funding and anticipated federal grant reimbursement of City expenses. BUILD grant funding for the project is subject to grant award. This project is currently in the City of Salem's FY 2022-2026 CIP. As of October 11, 2021, information regarding a design team or a general contractor is not available. Funding is anticipated in FY 2023 and FY 2024.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$18,949,680.00

Public - City

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
3
Bidding Soon
547
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

McGilchrist St SE, Salem, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.