BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 31, 2022 at 7:00 PM

Updated October 17, 2024

Addition to a water / sewer project in Peach Springs, Arizona. Conceptual plans call for the addition of a wastewater treatment plant.

Plan call to expand 70-mile water supply to Grand Canyon West. This project is part of the Tribe’s water rights settlement agreement. As of January 14, 2021, This project is conceptual. The water rights settlement agreement needs to be passed by both the House and Senate and then signed by the President prior to any further movement on the project. To date there has been no change to the Tribe’s water rights settlement agreement. An engineer has been selected for the project. A firm timeline for bidding and construction has not been established.

Conceptual

Water / Sewer

$173,000,000.00

Public - Federal

Addition

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
6
Bidding Soon
86
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2023

Project location map

Eagle Point Rd, Peach Springs, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.