BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction and addition to a mixed-use development in Shelby, North Carolina. Completed plans call for the construction of a 26,431-square-foot theater / auditorium; for site work for a theater / auditorium; educational facility; and for the demolition of a theater / auditorium.

As of 02/08/2022 This project has not been awarded. The Project consists of new construction of an approximately 26,400 sq. ft., 900-seat auditorium on the campus of Crest High School. Building Construction will not start until June of 2022. There will be an immediate award and sitework will start soon thereafter. Start Date: Work of this phase shall commence on June 9, 2022 Substantial Completion: August 4, 2023.. Final Completion: The Contractor shall complete the Work within 30 calendar days after Substantial Completion. The purpose of the subsurface exploration and geotechnical engineering evaluation was to explore the subsurface conditions at the site, collect representative samples of soil for examination in our laboratory, and provide conclusions and recommendations for design and construction of the proposed auditorium located at Crest High School, 800 Old Boiling Springs Road in Shelby, North Carolina. CVET's scope of work included the following: o Drilling of five (5) soil test borings; o Collection of representative samples of soil from the soil test borings; o Classification of collected soil samples and laboratory testing as necessary; o Preparation of boring logs, boring location plan, and general subsurface profile; o Evaluation of the encountered subsurface conditions at the site; and o Preparation of this geotechnical report. The project consists of the subsurface exploration and geotechnical engineering evaluation to aid in the design and construction of the proposed auditorium located at Crest High School, 800 Old Boiling Springs Road in Shelby, North Carolina. The subject property is an existing high school campus. The proposed auditorium is to be constructed immediately south of the high school building in an existing asphalt paved parking area. Elevations across the proposed site ranges from approximately 845 to 825 feet above mean sea level (amsl) (Cleveland County GIS). Finished grades for the proposed development have not been provided at the time of this report, although based upon the existing site conditions we anticipate finished floor elevations (FFE) to be approximately 838 feet above mean sea level (amsl). Based up the anticipated FFE, maximum cut and fill depths to facilitate finished grades will be on the order of 3.0 and 8.0 feet, respectively. *Addendum 1, 2 and 3 have been issued.

Bid Results

Educational

$10,000,000.00

Public - County

Addition, Demolition, New Construction, Site Work

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
135
Bidding Soon
1,824
All Active Projects
784
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 21, 2021

June 9, 2022

September 3, 2023

img_map_placeholder

800 Old Boiling Springs Rd, Shelby, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.