Demolition, site work and new construction of a bridge / tunnel in Wilmington, North Carolina. Conceptual plans call for the construction of a bridge / tunnel.

Plans call to construct a new 135 feet fixed bridge and demolish the existing bridge. The Department of Transportation is in the process of deciding which type of bridge will replace the current one and a decision is expected in the Fall of 2026. A timeline for design and construction has not yet been established. As June 4 2025, this project is in the planning phase. An engineer has not been selected. A firm timeline for construction has not been determined.

Conceptual

Bridges / Tunnels

$245,000,000.00

Public - County

Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
50
Bidding Soon
601
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

Project location map

nc-71, Wilmington, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.