BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in Raleigh, North Carolina. Completed plans call for the construction of a municipal facility.

As of February 2019, this project has not begun construction, however it is expected to begin in June of 2019. There is an awarded bidder. The previous solicitation has been included below for reference: The City of Raleigh, North Carolina is requesting Statements of Qualifications for Construction Management “at Risk” Services for the Neuse River Resource Recovery Facility (NRRRF) Bioenergy Recovery Program (BERP). This project includes pre-construction and construction services for the NRRRF BERP and other related work. The primary use of this facility will be for processing Class A biosolids from the City of Raleigh’s service area for land application and to beneficially utilize byproduct methane gas generated by anaerobic digestion. Some provision for the collection of a small percentage of imported biosolids from surrounding communities and fats, oils, and grease from third-party haulers is also planned. The City of Raleigh seeks a “Construction Management at Risk” firm with expertise constructing biosolids processing facilities requiring significant improvements to an active, large-scale (in excess of 15 MGD) advanced wastewater treatment facility. Demonstration of specialized experience in the following is desirable: - Proven capability and performance in pre-construction, procurement, construction, quality assurance and control, and commissioning services for all aspects of a fully-functional major advanced wastewater treatment facility. - Experience in directing and managing a multi-disciplinary team approach to projects of this type. - Experience and knowledge of treatment processes to achieve Class A biosolids as defined in 40 CFR part 503. Total Estimated Construction Budget: $95,000,000 - $105,000,000 • Anticipated completion of design: January 2018 • Anticipated commencement of construction: April 2018 • Anticipated completion of construction: April 2021

Award

Municipal

$105,000,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
53
Bidding Soon
1,182
All Active Projects
436
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2016

June 1, 2019

img_map_placeholder

8500 Battle Bridge Rd, Raleigh, NC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.