Site work, paving and outdoor lighting for a mixed-use development in Houston, Texas. Conceptual plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Update: Project provides for the design and construction for concrete paving with storm drainage, curbs, sidewalks, driveways, street lighting and necessary underground utilities. Project is included City of Houston Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- https://www.spartnerships.com/newsletter/2024/tgi-11-01-2024/texas-government-insider-11-01-2024.html Houston to invest $157 million into reconstructing streets The city of Houston will spend $156.6 million to reconstruct and improve connecting streets across three districts. Construction is expected to begin in fall 2025. The largest project - totaling $137 million - will fully reconstruct 5 miles of Antoine Drive. The chosen section of the road's infrastructure is deteriorating, does not support safe multimodal amenities for bicyclists or pedestrians and has utilities that have exceeded their service life. The Antoine Drive Project will improve pedestrian and bicycle facilities, installing nearly 53,000 feet of shared-used paths along either side of the road. The reconstruction efforts upgrade intersection safety, replace traffic signals and install additional street lighting. Plans include replacing three bridges and building a new one. In addition, the city will improve the road's storm sewer system and replace approximately 51,500 feet of wastewater and water lines. Houston will spend $8.2 million to repave and reconstruct the roads and drainage systems in the Gray and Taft area. Plans include installing 2.6 miles of pavement, more than 25,000 feet of sidewalks and 1,240 feet of bike lanes. The project will install 151 improved ADA-accessible ramps and 302 enhanced storm drains. In addition, the city will rebuild driveways as needed, install street lighting and replace 9,300 feet of stormwater, wastewater and water utility lines. The city will use $6.9 million to reconstruct Dunlavy Street. The project will pave 1,900 feet of roadway, install 2,450 feet of sidewalk, curbs and replace 44 trees. Plans include installing 5,400 feet of storm sewer, sanitary and water utility lines, reconstruct driveways and install street lighting. Houston will complete the $4.5 million feeder road project along Chimney Rock Road. Plans include building a pedestrian crosswalk at an intersection and extending nearby streets and sidewalks. In addition, the city will install a traffic signal and improve streetlights. -------------------------- Project provides for the design and construction for concrete paving with storm drainage, curbs, sidewalks, driveways, street lighting and necessary underground utilities. This project is included in the city's fy 2024-2028 Capital Improvement Program. As of June 24, 2024, further details regarding construction and completion timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$7,257,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
379
Active Projects
207
Bidding Soon
3,479
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.