Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Ellenton, Florida. Working plans call for site work for a road / highway; and for paving for a road / highway.
The owner has selected a Construction Manager. UPDATE : https://cdnsm5-hosted.civiclive.com/UserFiles/Servers/Server_7588306/File/Departments/Financial%20Management/CIP/FY24-28%20Adopted%20Capital%20Improvement%20Plan.pdf Design and construct additional lanes as required from US 301 to 29th St E with a new signalized intersection at Factory Shops Blvd. Construct additional/missing sidewalks and/or a multi-use path as required from 29th St E to Mendoza Road. This project also includes the design of 2 lanes with bike lanes and sidewalks from Mendoza Road north to the existing terminus coming south from 69th Street East and signalize the intersections of 60th Ave E at Mendoza Road and 69th St E. (Construction of this section will be under separate project numbers.) project is in manatee county- capital budget fy 2024-2028 cip 296 _________________________________________________________________________________________ UPDATE: https://cdn5-hosted.civiclive.com/UserFiles/Servers/Server_7588306/File/Departments/Financial%20Management/CIP/FY23-27%20AD%20CIP%20Book_%20Reduced.pdf Design and construct additional lanes as required from US 301 to 29th St E with a new signalized intersection at Factory Shops Blvd. Construct additional/missing sidewalks and/or a multi-use path as required from 29th St E to Mendoza Road. This project also includes the design of 2 lanes with bike lanes and sidewalks from Mendoza Road north to the existing terminus coming south from 69th Street East and signalize the intersections of 60th Ave E at Mendoza Road and 69th St E. (Construction of this section will be under separate project numbers.) This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of December 01, 2022, further details regarding design and construction have not been identified. ______________________ https://p1cdn4static.civiclive.com/UserFiles/Servers/Server_7588306/File/Departments/Financial%20Management/CIP/Adopted%20CIP%20Book_Reduced%20Size.pdf There are two requested changes for this project for improvements on 60th Ave E between US 301 and Mendoza Rd. First, combine the three existing projects and funds. Second, expand the scope of the project to include extend 60th Ave E north of Mendoza Rd to connect to the dead-end section coming south from 69th Street East. The resulting combined scope; Construct additional lanes as required from US 301 to 29th St E with a new intersection at Factory Shops Blvd. Construct additional/missing sidewalks and/or a multi-use path as required from 29th St E to Mendoza Rd. Construct new 2 lanes with bike lanes and sidewalks from Mendoza Rd north to the existing terminus coming south from 69th Street East and signalize the intersections of 60th Ave E at Mendoza and 69th St E. This creates an additional roadway connection from Moccasin Wallow Rd to the Outlet Mall and provides a second access to I-75. Combine the following projects into 6083160:TRRI015-6083160 - 60th Ave E - US 301 / Outlet Mall Entrance, TRRI014-6083161 - 60th Ave E - Factory Shop Blvd - Mendoza Road, TRII009-6083162 - 60th Ave E - K-Mart Project is included Manatee County FY 2022-2026 CIP Page 239 ____________________________________________________________________________________________________________ https://www.mysuncoast.com/2021/10/15/major-road-construction-project-getting-underway-i-75-us-301-ellenton/ Major road project getting underway at I-75 and U.S. 301 in Ellenton ELLENTON, Fla. (WWSB) - I-75 and U.S. 301 in Ellenton will look much different in the coming weeks, months and years. A $145 million road construction project gets underway on Monday. FDOT officials say it will improve traffic flow and safety in the area. "It will make a big difference in conjunction with everything that's happening on I-75, currently you have seen changes with State Road 70 and State Road 64," said Alvimarie Corales, a planning manager with the Sarasota/Manatee Metropolitan Planning Organization. "So it will improve traffic flow and the capacity I-75 can carry you." The main improvements include the U.S. 301 interchange going from the current cloverleaf design to a diamond design. Also, I-75 will be widened. Two new bridges will be built over the Manatee River. One will be for a northbound exit ramp and the other will be for a southbound entrance ramp. Noise walls will also be built in designated areas. "It'll help a lot but we still got people coming here building, building, building, so be ready to build more," said Edward Gaylord, an Ellenton resident. The project is expected to be finished sometime late in 2024 or early in 2025. "We understand there's going to be a lot of construction and a lot of concerns for this," said Corales. "But if you sit tight, we'll make sure these improvements help you get to your destination." The Florida Department of Transportation held a virtual meeting on Thursday where they answered questions from residents regarding this project. For more information on this project you can click on this link http://www.i75-us301.com/. ________________________________________________________ https://www.mymanatee.org/UserFiles/Servers/Server_7588306/File/FY21-25%20Adopted%20Capital%20Improvement%20Plan%20Compressed.pdf There are two requested changes for this project for improvements on 60th Ave E between US 301 and Mendoza Rd. First, combine the three existing projects and funds. Second, expand the scope of the project to include extend 60th Ave E north of Mendoza Rd to connect to the dead-end section coming south from 69th Street East. The resulting combined scope; Construct additional lanes as required from US 301 to 29th St E with a new intersection at Factory Shops Blvd. Construct additional/missing sidewalks and/or a multi-use path as required from 29th St E to Mendoza Rd. Construct new 2 lanes with bike lanes and sidewalks from Mendoza Rd north to the existing terminus coming south from 69th Street East and signalize the intersections of 60th Ave E at Mendoza and 69th St E. This creates an additional roadway connection from Moccasin Wallow Rd to the Outlet Mall and provides a second access to I-75. Project is included Manatee County FY 2021-2025 CIP Page 233 __________________________________________________________________________________________________________________________________________________________________________ There are two requested changes for this project for improvements on 60th Ave E between US 301 and Mendoza Rd. First, combine the three existing projects and funds. Second, expand the scope of the project to include extend 60th Ave E north of Mendoza Rd to connect to the dead-end section coming south from 69th Street East. The resulting combined scope; Construct additional lanes as required from US 301 to 29th St E with a new intersection at Factory Shops Blvd. Construct additional/missing sidewalks and/or a multi-use path as required from 29th St E to Mendoza Rd. Construct new 2 lanes with bike lanes and sidewalks from Mendoza Rd north to the existing terminus coming south from 69th Street East and signalize the intersections of 60th Ave E at Mendoza and 69th St E. This creates an additional roadway connection from Moccasin Wallow Rd to the Outlet Mall and provides a second access to I-75. The project is included in the 2020-2024 Capital Improvement Program (CIP). As of November 2020, the project is in design and construction documents are expected to be complete in the fall of 2021. Construction is expected to commence in the first quarter of 2022. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Pre-Construction/Negotiated
Roads / Highways
$14,453,000.00
Public - County
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 19, 2024
March 15, 2024
US-301 & 60th Ave E, Ellenton, FL
Related To This Project
Ellenton, FL
--
Ellenton, FL
Bid Date: Aug 01 2023
Ellenton, FL
Bid Date: Jan 06 2022
Ellenton, FL
--
Ellenton, FL
Bid Date: Dec 12 2018
Ellenton, FL
Bid Date: Jun 03 2021
Ellenton, FL
--
Ellenton, FL
--
Ellenton, FL
Bid Date: Jun 09 2023
Ellenton, FL
Bid Date: Jun 05 2023
Ellenton, FL
--
Ellenton, FL
--
Ellenton, FL
--
Ellenton, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.