BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Bradenton, Florida. Completed plans call for the renovation of a water / sewer project.

As of October 16, 2023, a contractor has been awarded. A firm timeline for construction completion has not been established. Replace existing motor control center (MCC) and service entrance breaker, remove transformer, distribution center, lighting panel, and equipment room lighting. Replace and upgrade all equipment as needed to bring electrical components up to current electrical standards. Replace generator, or install a stand-by auxiliary pump with diesel engine, with sizing appropriate for the recently replaced VFDs and new electrical improvements. Improve the electrical area to be an air conditioned space, or construct a new electrical building or enclosure. The new electrical system configuration will include arc flash electrical safety improvements for compliance with Occupational Safety and Health Administration (OSHA) and National Fire Protection Association (NFPA-70E). The MCC and main breaker need to be upgraded and brought up to proper National Electrical Code standard and upgraded to proper safety code. The generator needs to be replaced with a newer appropriately sized unit, or with an auxiliary pump with diesel engine that can provide reliable backup pumping during electrical outages. The project should include an evaluation of the feasibility, costs, advantages, and disadvantages of using an auxiliary pump versus a standby generator. Electrical gear needs to be enclosed in a climate-controlled space for long-term reliability. The project will include a feasibility study to determine the options and costs to improve the electrical area to be air conditioned or to construct a new electrical building or enclosure. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Under Construction

Water / Sewer

$987,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
52
Bidding Soon
1,064
All Active Projects
424
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.