Demolition, site work and paving for a civil project in Moline, Illinois. Completed plans call civil work for a bridge / tunnel and road / highway.
As of November 6, 2019, this project is under construction. Construction is expected to be completed in July of 2020. Tentative Construction Schedule: April 2018 - Pre-Stage work to be completed -Plug fill embankment and settlement -WB Arch and approach steel fabrication in progress -Arch and approach foundations in progress July 2018 - Stage 1A work to be completed -WB Arch and approach steel fabrication -WB Arch and approach substructure -Embankment for lower Ramp 6th-C in progress -Embankment for lower US 67 Ramp D in progress -WB Iowa Viaduct substructure in progress -Illinois detour route upgrades - not required to be complete until November 2018 -Iowa detour route upgrades - not required to be complete until November 2018 April 2019 - Stage 1B work to be completed -Paving in plug fill area in progress -Modified existing WB entrance ramp from River Drive -WB Arch and approach superstructures in progress -Iowa trunk line storm sewer -Southern portion of Ramp 6th-C, including retaining wall May 2019 - Stage 2A work to be completed -EB Arch and approach steel fabrication -EB Arch and approach substructures -WB Arch and approach superstructures in progress -WB IL Viaduct Pier 3 and superstructure in progress -WB I-74 pavement in Iowa from approx. Station 6819+00 to Middle Road -Embankment adjacent to existing WB entrance ramp November 2019 - Stage 2B work to be completed -WB Arch and approach spans completed -EB Arch and approach superstructures in progress -Ramp 6th-C Pier 3 -EB IL Viaduct off-line work in progress -Illinois WB I-74 Mainline and Ramps, all structures and pavement completed -Iowa WB I-74 Mainline and Ramps, all structures and pavement completed -Temporary Middle Road Ramp C April 2020 - Stage 2 winter work to be completed -Illinois EB plug fill mainline pavement and Ramp 6th-C pavement and bridge superstructure July 2020 - Stage 3A work to be completed -Iowa EB I-74 pavement -Middle Road Ramp C -US 67 Ramp A, including bridge and retaining wall -EB IA Viaduct and US 67 Ramp C in progress -EB Arch and approach superstructures in progress November 2020 - Stage 3B work to be completed -EB Arch and approach spans completed -Illinois EB I-74 Mainline and Ramps, all structures and pavement completed -Iowa EB I-74 Mainline and Ramps, all structures and pavement completed -Remaining Iowa local roads -Iowa detention pond May 2021 - Completion of various corridor-wide items -Landscaping -Demolition of the existing river crossing -Demolition of the existing viaduct structures in Bettendorf and Moline *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Under Construction
Roads / Highways
$800,000,000.00
Public - State/Provincial
Demolition, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 25, 2017
November 5, 2018
I-74, Moline, IL
Related To This Project
Moline, IL
Bid Date: Jun 05 2024
Moline, IL
Bid Date: May 28 2024
Moline, IL
Bid Date: Jul 11 2024
Moline, IL
Bid Date: Dec 22 2020
Moline, IL
Bid Date: Jul 29 2024
Moline, IL
Bid Date: Aug 15 2024
Moline, IL
Bid Date: Jul 25 2024
Moline, IL
Bid Date: Aug 13 2021
Moline, IL
Bid Date: May 28 2024
Moline, IL
Bid Date: Jun 14 2024
Moline, IL
Bid Date: Jun 03 2024
Moline, IL
Bid Date: Jun 04 2024
Moline, IL
--
Moline, IL
--
Moline, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.