BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work and paving for a civil project in Moline, Illinois. Completed plans call civil work for a bridge / tunnel and road / highway.

As of November 6, 2019, this project is under construction. Construction is expected to be completed in July of 2020. Tentative Construction Schedule: April 2018 - Pre-Stage work to be completed -Plug fill embankment and settlement -WB Arch and approach steel fabrication in progress -Arch and approach foundations in progress July 2018 - Stage 1A work to be completed -WB Arch and approach steel fabrication -WB Arch and approach substructure -Embankment for lower Ramp 6th-C in progress -Embankment for lower US 67 Ramp D in progress -WB Iowa Viaduct substructure in progress -Illinois detour route upgrades - not required to be complete until November 2018 -Iowa detour route upgrades - not required to be complete until November 2018 April 2019 - Stage 1B work to be completed -Paving in plug fill area in progress -Modified existing WB entrance ramp from River Drive -WB Arch and approach superstructures in progress -Iowa trunk line storm sewer -Southern portion of Ramp 6th-C, including retaining wall May 2019 - Stage 2A work to be completed -EB Arch and approach steel fabrication -EB Arch and approach substructures -WB Arch and approach superstructures in progress -WB IL Viaduct Pier 3 and superstructure in progress -WB I-74 pavement in Iowa from approx. Station 6819+00 to Middle Road -Embankment adjacent to existing WB entrance ramp November 2019 - Stage 2B work to be completed -WB Arch and approach spans completed -EB Arch and approach superstructures in progress -Ramp 6th-C Pier 3 -EB IL Viaduct off-line work in progress -Illinois WB I-74 Mainline and Ramps, all structures and pavement completed -Iowa WB I-74 Mainline and Ramps, all structures and pavement completed -Temporary Middle Road Ramp C April 2020 - Stage 2 winter work to be completed -Illinois EB plug fill mainline pavement and Ramp 6th-C pavement and bridge superstructure July 2020 - Stage 3A work to be completed -Iowa EB I-74 pavement -Middle Road Ramp C -US 67 Ramp A, including bridge and retaining wall -EB IA Viaduct and US 67 Ramp C in progress -EB Arch and approach superstructures in progress November 2020 - Stage 3B work to be completed -EB Arch and approach spans completed -Illinois EB I-74 Mainline and Ramps, all structures and pavement completed -Iowa EB I-74 Mainline and Ramps, all structures and pavement completed -Remaining Iowa local roads -Iowa detention pond May 2021 - Completion of various corridor-wide items -Landscaping -Demolition of the existing river crossing -Demolition of the existing viaduct structures in Bettendorf and Moline *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Under Construction

Roads / Highways

$800,000,000.00

Public - State/Provincial

Demolition, Paving, Site Work

104

8

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
45
Bidding Soon
603
All Active Projects
304
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2017

November 5, 2018

img_map_placeholder

I-74, Moline, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.