BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Bel Air, Maryland. Completed plans call for the renovation of a water / sewer project.

The Sod Run WWTP is a 20 MGD ENR facility with a modified 5 stage Bardenpho activated sludge process followed by denitrification filters. The plant utilizes primary solids fermenters to create a carbonaceous BOD feed into activated sludge process, enhancing Nitrogen removal. Waste activated sludge is thickened by gravity belt thickeners to 5 % solids and pumped along with the fermented primary clarifier solids to anaerobic digestion. Currently the digested solids are temporarily stored (2-5 days) and then dewatered by belt filter press (BFP). The dewatered biosolids range from 15 to 18% solids. BFP capture is low, around 85 to 89%. The Biosolids are temporarily stored onsite prior to land application as a class B Bio-solids. Harford County is requesting qualified firms provide a proposal for the scope of services outlined herein. This scope outlines the design and development of contract documents for construction improvements to the Sod Run WWTP dewatering building and processes. This project is the initial phase in a Biosolids Master Plan (B&V 2016) which has been developed to upgrade and maintain the Harford County biosolids handling facilities concurrent to the changing MDE biosolids regulations.

Award

Water / Sewer

$4,303,400.00

Public - County

Renovation, Site Work

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
243
Active Projects
122
Bidding Soon
2,808
All Active Projects
1,128
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2018

January 14, 2019

img_map_placeholder

Multiple Locations, Bel Air, MD

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.