Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a water / sewer project in Ames, Iowa. Design plans call for the construction of a water / sewer project.
Lime residuals from the water softening process are stored and dewatered in large storage lagoons. The material is removed annually in the fall and recycled by applying it to farm fields as an agricultural liming agent. The cost of the annual removal and application is budgeted in the operating budget. A project is underway in FY 2021/22 to rebuild the trench drain in the bottom of one of the oldest cells. These drains aid in the dewatering process. Over time, they have plugged with fine lime particles and have been damaged due to the excavation of lime from the cells using a back hoe. The same modifications are planned for the two oldest cells for FY 2024/25 ($222,000). The purchase of a replacement decant pump ($55,000) is also planned for FY 2024/25. A project that will partially subdivide the large north cell is planned for design in FY 2024/25 with construction the following year. FY 2024/25 Underdrain replacements ($222,000); replacement decant pump ($55,000); design of new cell ($131,000) FY 2025/26 Construction of new cell ($1,131,000) As of July 13, 2022, this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. As of August 28, 2023, no new information available
Design
Water / Sewer
$1,353,000.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2024
E 13th St, Ames, IA
Related To This Project
Ames, IA
Bid Date: Dec 14 2022
Ames, IA
Bid Date: Aug 10 2022
Ames, IA
Bid Date: Dec 07 2022
Ames, IA
--
Ames, IA
Bid Date: Nov 23 2022
Ames, IA
Bid Date: Dec 15 2022
Ames, IA
Bid Date: Jan 12 2023
Ames, IA
Bid Date: Jun 12 2020
Ames, IA
Bid Date: Nov 16 2022
Ames, IA
Bid Date: Nov 17 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.