BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Winnipeg, Manitoba. Design plans call for the construction of a 90,000-square-foot, one-story above grade clubhouse / community center; and fitness / recreation center.

Construction of a new recreation facility that will include three gymnasiums, a 200 metre walking track, fitness areas, multi-purpose rooms, associated change rooms and administrative spaces along with an outdoor spray pad. TIMELINE: Schematic design of the recreation centre and child care centre & Class 4 cost estimate was completed late 2023. Project forecast to be over-budget by approximately $23 million, based on a recently-received Class 4 estimate (range -30 percent to +60 percent) from the City’s project consultant. The current approved budget for the recreation centre component is $71 million. The city is reviewing options for increased budget, seek further government funding or reduce the scope. An administrative report with recommendations will be presented to the Standing Policy Committee on Community Services May 8, 2024. Updates may be available fall 2024. *Owner has estimated a total cost of $89,036,000 for Phase 1. *The Government of Canada is investing more than $31.6 million in this project through the Community, Culture, and Recreation Infrastructure Stream of the Investing in Canada Infrastructure Program. In addition, the Government of Manitoba is funding over $31.1 million, and the City of Winnipeg is contributing more than $16.2 million towards eligible costs for the project.

Design

Clubhouse / Community Centers

$89,036,000.00

Public - City

LEED Certification, New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
6
Bidding Soon
212
All Active Projects
53
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2025

img_map_placeholder

Kenaston Blvd and Bison Drive, Winnipeg, MB


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.