Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a mixed-use development in Edmonton, Alberta. Completed plans call for the construction of a transportation facility.
The work includes, but not limited to, construction of a 4.5-km light-rail extension south from Century Park station (the current terminus) to the new Ellerslie station. The project will include two new permanent LRT stations, a new operations and maintenance facility (OMF), and integration with and expansion of the Heritage Valley Park and Ride facility and transit centre. Construction of a 4.5 km LRT extension from Century Park to Allard/Desrochers; to run between 127 and 135 Streets. The Project will extend the Capital line southward from the current terminus at Century Park to Ellerslie Rd via 111 St and a Right of Way just east of 127 Street, south of AHD. This will be a high floor LRT and to include an underpass at 23 Avenue; bridges crossing Blackmud Creek and Anthony Henday Drive; and a new station at Twin Brooks; and an operations and maintenance facility south of Anthony Henday Drive. Method of delivery will be Design-Build. TIMELINE: Design-Build contract has been awarded to Capital Line Design-Build Ltd. (comprised of Aecon, Ledcor, and AECOM as the Design Partner).
Award
Transportation Terminals
$1,340,000,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
15
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 12, 2022
April 14, 2025
23 Ave NW & 111 St NW, Edmonton, AB
Related To This Project
Edmonton, AB
Bid Date: Dec 16 2022
Edmonton, AB
Bid Date: Dec 02 2022
Edmonton, AB
Bid Date: Dec 12 2022
Edmonton, AB
Bid Date: Dec 08 2022
Edmonton, AB
Bid Date: Jan 20 2022
Edmonton, AB
Bid Date: Feb 03 2022
Edmonton, AB
Bid Date: Apr 14 2021
Edmonton, AB
Bid Date: Nov 20 2018
Edmonton, AB
--
Edmonton, AB
Bid Date: Dec 20 2022
Edmonton, AB
Bid Date: Dec 13 2022
Edmonton, AB
Bid Date: Jun 07 2022
Edmonton, AB
Bid Date: Apr 01 2022
Edmonton, AB
Bid Date: Apr 05 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.