BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in Chalk River, Ontario. Working plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Construction Services for the Near Surface Disposal Facility. Construction services includes: Engineered Containment Mound (ECM) to encapsulate the disposed wastes. The ECM will be built in two phases with the current phase (Phase 1) enabling an initial waste capacity of 525,000 cubic metres (m3); Waste Water Treatment Plant (WWTP) to receive and process contact water and leachate and discharge effluent to the environment that fully satisfies codes and standards. Support Facilities including a vehicle decontamination facility, office, operations support centre, security kiosk, and weigh scales; and, Site Infrastructure that comprises, for example, fencing, roads, utility tie-ins and services. TIMELINE: Project has been awarded to Wood PLC, Maple Reinders is the subcontractor. Awarded trades were not released for publication. On January 9, 2024, the Canadian Nuclear Safety Commission (CNSC) announced the Commission’s decision amend the licence for Chalk River Laboratories, authorizing Canadian Nuclear Laboratories (CNL) to construct a near surface disposal facility (NSDF) on the site. The Commission made the decision under the Nuclear Safety and Control Act following their conclusion that CNL’s NSDF Project is not likely to cause significant adverse effects, given that CNL implements all proposed mitigation and follow-up monitoring, which include ongoing engagement with Indigenous Nations and communities. As well, the Commission assessed that the safety case for the facility as robust and indicative that the NSDF will meet its required design life of more than 500 years. Currently, CNL is taking time to review and analyze the Record of Decision before determining our next steps. CNL is aware that applications have been filed for a judicial review of the CNSC’s decision to approve construction of the NSDF. Updates will be made upon announcement that construction has commenced, timing is unreleased at this time.

Pre-Construction/Negotiated

Water / Sewer

$100,000,000.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
2
Bidding Soon
89
All Active Projects
36
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2017

April 21, 2025

img_map_placeholder

1 Plant Rd, Chalk River, ON


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.