BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Seattle, Washington. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

The Montlake Phase is one of several projects programmed to replace windstorm- and earthquake-vulnerable structures as well as to improve mobility for people and commerce across Lake Washington and through the SR 520 corridor from Seattle to Redmond. The Montlake Phase project will include: Replacing the West Approach Bridge (Br 520/7.5) with a new West Approach Bridge South (WABS) structure, providing a final connection with the south half of the new floating bridge with the western Lake Washington shoreline at the vicinity of 24th Ave E. The new WABS structure will be built to accommodate an added eastbound (EB) HOV lane, Replacing the existing Montlake Blvd. (SR 513) undercrossing (Br 513/10) with a new community enhanced lid structure, The new lid structure includes modifications to the SR 520 and Montlake Blvd. (SR 513) interchange and the 24th Ave E interchange (including reconstruction of portions of the EB SR 520 off-ramp to Montlake Blvd., the EB SR 520 on-ramp from Montlake Blvd., the westbound (WB) SR 520 on-ramp from Montlake Blvd., the WB SR 520 off-ramp to Montlake Blvd. and the WB SR 520 off-ramp to 24th Ave E), The addition of two new direct access ramps at the reconstructed 24th Ave E interchange including an EB on-ramp and a WB off-ramp, New pedestrian crossing over SR 520 (pedestrian land bridge) connecting pedestrian trails from the Washington Park Arboretum (on the south side of SR 520) with pedestrian trails at the East Montlake Park (on the north side of SR 520), and Other multi-modal improvements including: improved connections for paths and trails at various locations, and completion of a new shared-use tunnel under Montlake Blvd. (with final connection to the existing Bill Dawson Trail to be completed in the future Portage Bay Bridge Project). As of February 23, 2022, further bid packages will be released, however, the timeline for release has not been disclosed. Construction is underway and is estimated to be complete in March of 2023.

Under Construction

Bridges / Tunnels

$455,349,888.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

14

13

2763

9

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
31
Bidding Soon
878
All Active Projects
368
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2018

June 3, 2019

img_map_placeholder

WA-520, Seattle, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.