Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a bridge / tunnel in Woburn, Massachusetts. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; and for the demolition of a bridge / tunnel.
Location: Woburn Project Type: Bridge - Construction Federal Aid No.: STP-0034(012)X MASSDOT - Bridge Replacement Bridge Number W-43-017 (Steel) New Boston Street Over the MBTA Railroad The work under this Contract consists of reconstructing approximately 1,660-feet (0.31-miles) of New Boston Street and the construction of Bridge No. W-43-017 over the New Hampshire Main Line of the MBTA Commuter Rail in Woburn, Massachusetts. The proposed reconstruction of the corridor will include: earth excavation, full depth hot mix asphalt pavement, cement concrete sidewalk and wheelchair ramps, granite curb, pavement markings, signs, upgrade of an existing closed drainage system, hazardous material removal, utility pole coordination and installation of conduit and water main, construction of a 3-span bridge, in-situ subsurface soil improvements, construction of retaining walls, and construction of detention basins and other incidental work to accommodate roadway improvements. All work under this Contract shall be done in conformance with the 2021 Standard Specifications for Highways and Bridges, the Supplemental Specifications contained in this book, the 2017 Construction Standard Details, the Traffic Management Plans and Detail Drawings, MassDOT Work Zone Safety Temporary Traffic Control, the 1990 Standard Drawings for Signs and Supports; the 2015 Overhead Signal Structure and Foundation Standard Drawings, the 2009 Manual on Uniform Traffic Control Devices (MUTCD) with Massachusetts Amendments; the 1968 Standard Drawings for Traffic Signals and Highway Lighting; The American Standard for Nursery Stock; the Plans and these Special Provisions.
Award
Bridges / Tunnels
$23,549,743.00
Public - City
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 25, 2022
March 22, 2022
New Boston St, Woburn, MA
Related To This Project
Woburn, MA
Bid Date: May 08 2024
Woburn, MA
Bid Date: Nov 21 2023
Woburn, MA
--
Woburn, MA
--
Woburn, MA
Bid Date: Mar 20 2024
Woburn, MA
Bid Date: Mar 29 2024
Woburn, MA
Bid Date: Apr 07 2022
Woburn, MA
--
Woburn, MA
Bid Date: Dec 15 2021
Woburn, MA
Bid Date: Jan 06 2022
Woburn, MA
Bid Date: Dec 06 2021
Woburn, MA
Bid Date: Aug 24 2023
Woburn, MA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.