Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 15, 2026 at 8:00 PM

Updated October 21, 2026

Site work and paving for a bridge / tunnel in Edmonton, Alberta. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The High Level Bridge will undergo targeted structural rehabilitation to ensure the bridge continues to operate safely until its eventual replacement. TIMELINE: Design is 30% complete. Construction is currently forecasted for 2028. Further update may be confirmed spring 2027.

Design

Bridges / Tunnels

$20,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
32
Bidding Soon
583
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2028

Project location map

109 St NW, Edmonton, AB


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed