BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 29, 2026 at 8:00 PM

Updated May 30, 2026

Site work and paving for a bridge / tunnel in Edmonton, Alberta. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The High Level Bridge will undergo targeted structural rehabilitation to ensure the bridge continues to operate safely until its eventual replacement. TIMELINE: Design is 30% complete. Construction is currently forecasted for 2028. *Planning and design work for the eventual replacement of this bridge is not expected prior to 2031.

Design

Bridges / Tunnels

$20,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
49
Bidding Soon
644
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2028

Project location map

109 St NW, Edmonton, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.