Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Addition to an educational facility in Toronto, Ontario. Working plans call for the addition of a 12,000-square-foot, three-story above grade educational facility.
Construction of an addition to Hodgson Public School. The proposed scope of the project involves the demolition of the 1960s-wing of the building and the construction of a new 391 pupil place addition, including a new gymnasium. The three-storey addition would include: On the lower level - 3 instructional classrooms, 1 instrumental music room, 1 unloaded resource room, Gymnasium, including stage, change rooms, servery, storage areas, Administration area (existing to be renovated into classroom space), and Washrooms. On the Ground level; 5 instructional classrooms, 1 art room, 1 unloaded resource room, Library (existing is undersized and will be renovated into classroom space), and Washrooms. On the Second Level; 8 instructional classrooms, 1 unloaded resource room, Washrooms, and Academic storage. The project also involves a renovation and revitalization of the 1914 to 1927 structure. This would involve the conversion of non-instructional space into usable classrooms. This ultimately reduces the number of new pupil places required in the building and provides an opportunity to refresh existing space for instructional use. The renovations would occur on the lower and ground levels of the school and provide 80 new pupil places for instruction. Alterations include the following. Lower Level The existing cafeteria will be converted into two instructional classrooms; The existing resource room adjacent to the cafeteria will be converted into a classroom. Ground Level The existing library will be converted into two instructional classrooms. The former administration area will be converted into an instructional classroom. Existing classroom will be demolished. Existing instrumental music room will be demolished. Second Level An existing science room will be renovated into a staff/teacher workroom. TIMELINE: Working drawings are complete. Ministry approval to proceed has been secured. Tender for general contractor is anticipated late 2023/early 2024 with an award expected early spring 2024. Construction is expected to begin spring/summer 2024 with completion anticipated fall 2026. *The total project cost is $21,780,000.
Final Planning
Educational
$6,000,000.00
Public - State/Provincial
Addition
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
April 1, 2024
September 1, 2026
282 Davisville Ave, Toronto, ON
Related To This Project
Toronto, ON
Bid Date: Jun 30 2022
Toronto, ON
--
Toronto, ON
--
Toronto, ON
Bid Date: Jan 15 2021
Toronto, ON
--
Toronto, ON
Bid Date: Nov 28 2023
Toronto, ON
--
Toronto, ON
--
Toronto, ON
Bid Date: May 30 2022
Toronto, ON
Bid Date: May 30 2022
Toronto, ON
Bid Date: May 11 2022
Toronto, ON
Bid Date: May 11 2022
Toronto, ON
Bid Date: May 12 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--