Site work and paving for a road / highway in Harriman, Tennessee. Design plans call for site work for a road / highway; and for paving for a road / highway.
The proposed design for SR 29 includes construction of a five-lane facility with two 12-foot travel lanes in each direction, a center turn lane, and 10-foot paved shoulders with variable right-of-way widths. Various design options, or build alternatives, are being studied regarding the proposed improvements to the route. Outlined below are the specific design features of each Build Alternative. No-Build Alternative: This option would not improve SR 29 and serves as a baseline against which to compare the other Build Alternatives. Build Alternative A: This option would follow a new alignment, south of existing SR 29, from near Wolf Creek Road to near Concord Road. From north of Concord Road, the new alignment would continue to the northeast, around the east side of Robbins, crossing Brimstone Road and School House Road. After crossing School House Road, the route would turn northwest, crossing Tunnel Hill Road and tying back into existing SR 29 near Old US 27, north of Robbins. From Old US 27, the route would follow existing SR 29 to near SR 63 in Huntsville. Build Alternative B: This option would follow a new alignment, south of existing SR 29, from near Wolf Creek Road to near Concord Road. From north of Concord Road, the new alignment would continue to the northwest, around the west side of Robbins, crossing existing SR 29, the Norfolk-Southern railroad, Boles Road, and Todd Road. After crossing Todd Road, the route would then turn northeast, crossing Black Creek Road, Sims Road, and the Norfolk-Southern railroad, before tying back into existing SR 29 near Old US 27, north of Robbins. From Old US 27, the route would follow existing SR 29 to near SR 63 in Huntsville. As of July 12, 2022, the project is in design. Further details regarding design completion and firm construction timelines have not been identified. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Design
Roads / Highways
$56,783,093.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 3, 2023
US-27 & Mossy Grove Rd, Harriman, TN
Related To This Project
Harriman, TN
Bid Date: Jul 14 2022
Harriman, TN
Bid Date: Oct 28 2020
Harriman, TN
Bid Date: May 24 2022
Harriman, TN
Bid Date: Feb 05 2021
Harriman, TN
Bid Date: Jul 19 2021
Harriman, TN
Bid Date: Mar 09 2023
Harriman, TN
Bid Date: Apr 11 2023
Harriman, TN
Bid Date: May 02 2023
Harriman, TN
Bid Date: Jun 08 2022
Harriman, TN
Bid Date: Jun 06 2022
Harriman, TN
Bid Date: Apr 13 2022
Harriman, TN
Bid Date: Apr 12 2022
Harriman, TN
Bid Date: Jan 18 2023
Harriman, TN
--
Harriman, TN
Bid Date: Dec 21 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.