BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and new construction of a clubhouse / community center in Los Altos Hills, California. Completed plans call for the construction of a 24,500-square-foot, 162-space clubhouse / community center.

The existing Los Altos Community Center, located at 97 Hillview Avenue, Los Altos, was originally a school. It contains approximately 9 buildings with several ancillary structures which function as the community center. The layout of the buildings does not efficiently provide for the future needs of the community and the structures are nearing the end of their useful lifecycle; therefore, the City requires the existing buildings, including the parking lot that serves it, to be demolished in preparation for the construction of a new 24,500 SF community center. The location of the site is nestled within a residential neighborhood and located within the greater Los Altos City Campus. The campus also contains City Hall, the library, Los Altos Police Department, a history museum, the Bus Barn Theater, a soccer field, and a baseball field. These facilities will remain open and operational during construction of the new community center. The cost of construction has been estimated to be approximately $24M and construction is scheduled to start in late July or early August 2019. The construction work must be executed in compliance with applicable statutes, ordinances, rules, and regulations of all Federal, State, County, City, and other agencies having jurisdiction over the Project. PRE-QUALIFICATION SCHEDULE: RFQ issued April 24, 2019 Pre-Qualification Meeting May 06, 2019 Deadline for Requests for Clarifications May 06, 2019 Last Day for Issuance of Addenda May 07, 2019 Pre-Qualification Package Due Date from Contractors May 09, 2019 Pre-Qualified Contractors Identified Week of May 13, 2019 Notice of Pre-Qualification Status Week of May 13, 2019 Appeal Period 5 Business Days following Notice of PreQualificationStatus The above scheduled dates are tentative, and City retains the sole discretion to adjust the above schedule. Nothing set forth herein shall be deemed to bind City to award a contract for the Project and City retains the sole discretion to cancel or modify any part of or all of this RFQ at any time.

Award

Clubhouse / Community Centers

$27,300,000.00

Public - City

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
73
Bidding Soon
1,467
All Active Projects
633
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2019

December 9, 2019

img_map_placeholder

97 Hillview Ave, Los Altos Hills, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.