Site work and new construction of a transportation facility in Arlington, Virginia. Design plans call for the construction of a transportation facility.
The access improvement plan for the Ballston-MU Metrorail Station includes a new entrance at the west end of the station to provide easier access from the Glebe Road area and growing development in the western part of Ballston. This new entrance will be located at the intersection of N. Fairfax Drive and N. Vermont Street and will include two street level elevators and either escalators or stairs connecting to an underground passageway and new mezzanine with stairs and elevators to the train platform. The new entrance will have fare gates, fare vending machines, and an attended kiosk. The project is a carryover from past CIPs. The land owner/developer of adjacent property began the engineering and design of the west entrance as part of the approved site plan for redevelopment of the adjacent private property. The developer advanced the design work to the 30% design level, but put work on hold in 2006 due to market conditions and postponement of the approved site plan for the adjacent private property of which the new entrance was part. Subsequently, the property has changed ownership and the new developer may submit a revision to the site plan. The proposed funding plan consists of local, state, and private sector funding. Arlington will coordinate with WMATA to complete the design to 100% final construction documents. Arlington and WMATA will need to develop and approve a project coordination agreement. In addition, Arlington, WMATA and the adjacent property owner will need to develop and approve a tri-party project agreement. This project also includes associated on-street transit facilities for connecting bus service. The project is included in the county's adopted FY2019 - FY2028 Capital Improvement Plan (CIP). As of April 11, 2022, the County has issued a task order to an on-call architecture and engineering (A&E) firm to update the previous set of 35% design plans for the project and to prepare bridging documents for a design-build procurement, and another task order to an on-call construction cost estimating firm to perform a top-to-bottom review of the project with the goal of reducing costs and revising the funding plan. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Design
Transportation Terminals
$1,000,000.00
Public - County
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2023
4420 Fairfax Dr, Arlington, VA
Related To This Project
Arlington, VA
Bid Date: Apr 12 2022
Arlington, VA
Bid Date: Apr 12 2022
Arlington, VA
Bid Date: Apr 15 2022
Arlington, VA
Bid Date: May 09 2019
Arlington, VA
Bid Date: Apr 20 2022
Arlington, VA
Bid Date: Apr 22 2022
Arlington, VA
Bid Date: Apr 22 2022
Arlington, VA
Bid Date: Apr 22 2022
Arlington, VA
Bid Date: Feb 08 2023
Arlington, VA
Bid Date: Dec 12 2022
Arlington, VA
--
Arlington, VA
--
Arlington, VA
--
Arlington, VA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.