Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 18, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a civil project in Las Vegas, Nevada. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.

*As of August 18, 2022, the Design Build Project is currently in its first phase. Construction began May 31, 2022, and is expected to go through mid-2025. The Project will provide improved capacity and operations for the I-15/Tropicana interchange, its surrounding roadway network, and HOV ramps at Harmon Avenue, consistent with the Department's current design standards and the Department's project traffic forecast for year 2040. The Project elements may include, but are not limited to, design and construction of structures, turning lanes, auxiliary lanes, pavements, retaining walls, drainage systems, signs and pavement markings, traffic signals, ATMs, ITS, lighting, safety devices, landscaping and aesthetic treatment, and other elements providing for the overall functionality of the roadway system. The Project will improve capacity and operations for the I-15/Tropicana Avenue interchange and surrounding roadway network. The Project is anticipated to consist of the following elements: A) Replace the existing Tropicana Ave. interchange and structure over I-15 for added capacity. B) Replace the existing flyover to allow for the widening of Tropicana Ave. over I-15 and to maintain existing connectivity. C) Add HOV ramps to and from the south at Harmon Avenue, allowing HOV direct access to the Las Vegas Strip. D) Modify signalized intersection and configuration of Dean Martin Drive and Tropicana Ave. to limit access to right-in and right-out. E) Modify or add active traffic management (ATM) sites along I-15. An EA has been completed for the Project, which contains additional information. The EA and the FONSI are available on the Website.

Under Construction

Bridges / Tunnels

$175,000,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
20
Bidding Soon
754
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2021

May 31, 2022

Project location map

I-15, Las Vegas, NV

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed