BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 15, 2019 at 8:00 PM

Updated April 9, 2025

Renovation of an educational facility in Columbus, Ohio. Completed plans call for the renovation of a educational facility.

ELC Renovation Ohio State School for the Blind Columbus / Franklin County EDGE Participation Goal: 5.0% of contract Domestic steel use is required per ORC 153.011. Estimated Cost General Contracting $1,224,000 Total General Contracting Alternates $257,000 The Work of Project is defined by the Contract Documents and consists of the following: 1. Project includes the demolition and replacement of exterior windows. As partr of the work window HVAC units will demolished and new HVAC systems will be installed.Additional other Work as indicated in the Contract Documents.

Award

Educational

$1,224,000.00

Public - State/Provincial

Renovation

35

20

17

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
144
Bidding Soon
2,584
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2019

April 29, 2019

Project location map

5220 N High St, Columbus, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.