Site work for a water / sewer project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.

As of June 15, 2022, a general contractor has been awarded and construction is underway. The purpose of the project is to reduce flood risk on Wilson Park Creek in the vicinity of S. 6th Street and W. Armour Avenue for over 60 residential and commercial structures located in the one percent annual probability floodplain. The project will improve public safety, reduce flood related health risks, and improve aquatic and riparian habitat. The project also replaces 2,800 linear feet of concrete channel lining with a more naturalized channel. The concrete lining is a District asset that was installed in the 1960s and is reaching the end of its useful life. The project scope consists of: constructing a 190-acre-foot (62 MG) flood storage basin in open land behind the Central Steel & Wire facilities; increasing the capacity of the culverts at S. 5th Street and at S. 6th Street; removing the concrete channel lining and replacing it with a natural channel design; and reconstructing 2,200 feet of non-concrete lined stream channel to increase flood storage and improve the stream and riparian habitat. The increase in total project cost is due to updated labor and design costs as well as inflation. No significant operating budget impact is expected. Construction Start: Sep-21 Finish: Jan-26 As of August 11, 2021, this project is currently in the FY 2021 CIP . Funding for this project is allotted in the city's capital improvement plan for construction FY 2021. Construction is anticipated to begin in September 2021 and be completed in January 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Under Construction

Water / Sewer

$26,093,251.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
62
Bidding Soon
1,531
All Active Projects
645
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2021

img_map_placeholder

S 6th St & W Armour Ave, Milwaukee, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.