BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 16, 2019 at 8:00 PM

Updated September 14, 2023

Site work for a bridge / tunnel in Fort McMurray, Alberta. Completed plans call for site work for a bridge / tunnel.

63:11, B.F. 76001 – Carrying Hwy. 63 over Prairie Creek, S. of the Urban Service Area of Fort McMurray Fort McMurray Region Approximate Quantities: 118m Smooth Wall Steel Pipe (2140 mm dia) 72.82 m TLP Liner 57.41 m CSP Liner (2400 mm dia) 260 m3 Concrete Grouting of Liner (CSP and TLP) 505 m3 Heavy Rock Riprap 6100 m3 Common Excavation 3650 t Granular Base Course 4880 t Asphalt Concrete Pavement Contractor to supply all materials.

Award

Bridges / Tunnels

$5,087,785.00

Public - State/Provincial

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

85 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
0
Bidding Soon
57
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2018

January 7, 2019

Project location map

AB-63, Fort McMurray, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.