BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Plymouth, Minnesota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

The existing interchange consists of a cloverleaf design that does not include any accommodations for people walking or biking. Therefore, non-motorized users are required to travel either in the median or along the side of the roadway, resulting in a feeling of discomfort. Additionally, the ramp entrances and exits are designed to provide people driving with a high level of service, allowing vehicles to complete turning movements at relatively high speeds. The existing bridge (#27551) is owned and maintained by MnDOT; who has indicated that improvements are necessary based on its age (built in 1972) and current condition. The proposed project will replace the existing interchange with one that includes a folded tight-diamond design to provide more traditional intersections at the freeway ramp entrances and exits. These two intersections will be controlled by traffic signals and will reduce the number of conflict points for people walking and biking through the area. This proposed concept includes a multi-use trail on both sides of the roadway; these facilities are critical for providing safe multimodal accommodations across TH 169. Staff anticipates that capital activities will be extended west towards the intersction of Nathan Lane and to the east towards the intersection of Gettysburg Avenue to address aging assets. This section (between Nathan Lane and Gettysburg Avenue) was last reconstructed in 1966 and would benefit significantly from new pavement, curb, drainage, and traffic signals. Additionally, this project presents an opportunity to construct a multi-use trail along both sides to expand the existing bikeway network. It should be noted that at the completion of this project, a gap will remain in the bikeway network on the east side of TH 169. A followup project(s) will be required to close this gap and provide a continuous multi-use trail for people biking. As of February 15, 2022, this project is currently in the FY 2022-2026 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$1,900,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
83
Bidding Soon
794
All Active Projects
320
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2023

img_map_placeholder

US-169, Plymouth, MN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.