BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Spring Lake, North Carolina. Working plans call for the renovation of a playground / park / athletic field; and for site work for a playground / park / athletic field.

As of March 14, 2023, this project is in the final planning phase. It is anticipate bidding will commence in September 2023, with construction starting in December 2023. Contract ID 16-14423-02A Advanced Planning, Design, and Construction Administration services for the initial development of the Long Valley Farm Visitor Day Use Area as identified by the current Park Master Plan. The design team must demonstrate historic preservation experience. There are three component phases to this project: Advanced Planning will include the inspection, evaluation, and conceptual plans for the existing Rockefeller House, Grist Mill, and Pavilion structures for renovation and adaptive reuse. This task will provide a record of the current condition of these structures, develop conceptual building restoration plans, and provide preliminary construction estimates based on the conceptual plans (OC-25). Design Services consisting of the preparation of construction documents for the Owner selected and approved concepts for the three structures from the Advanced Planning. In addition to three structures to be restored, the design of the initial development of the park, roughly based on Figure 9.3 of the Carvers Creek State Park Master Plan, will be part of the scope of work. This scope includes extending roadways and utility services to the Day Use Areas, construction of a vehicle bridge of Jumping Run, the construction of two parking areas, two restrooms, and two group picnic shelters. Construction Administration to implement the restoration of the three structures and the development of the Day Use Area, based on the prepared construction documents. NC Licensing Statement: In order to offer architectural, engineering, or landscape architectural services in response to this solicitation, the proposing firm must be properly licensed to practice Architecture, Engineering, or Landscape Architecture in the State of North Carolina. The method of contractor selection is not determined at this time.

Final Planning

Playgrounds / Parks / Athletic Fields

$5,619,000.00

Public - State/Provincial

Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
51
Bidding Soon
1,308
All Active Projects
530
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2023

img_map_placeholder

2505 Long Valley Rd, Spring Lake, NC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.