BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Gresham, Oregon. Working plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

UPDATE : The Transportation Division was awarded an MTIP/RFFA grant to complete the improvement of Cleveland from Burnside to Stark providing pedestrian and bicycle connections as well as adding a median turn lane, drainage and street lighting. The project is located in the North Central and Central City Neighborhood Districts. SDC project #G45. Project is included City of Gresham FY 2023-2027 CIP Page 14. -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The Transportation Division was awarded an MTIP/RFFA grant to complete the improvement of Cleveland from Burnside to Stark providing pedestrian and bicycle connections as well as adding a median turn lane, drainage and street lighting. The project is located in the North Central and Central City Neighborhood Districts. SDC project #G45. Project is included City of Gresham FY 2020-2025 CIP Page 14 _______________________________________________________________________ The Transportation Division was awarded an MTIP/RFFA grant to complete the improvement of Cleveland from Burnside to Stark providing pedestrian and bicycle connections as well as adding a continuous median turn lane, drainage and street lighting. The project is located in the North Central and Central City Neighborhood Districts. SDC project #45. Project is included City of Gresham FY 2020-2025 CIP Page 14 __________________________________________________________________________________________________________________________________________________________________________ Complete phase two of the project by improving substandard section of Cleveland Ave between Stark and Burnside. Project will fill gap in by providing bike lanes, sidewalks, curbs and gutters. As of April 10, 2019 no new CIP issued, this project is currently in the FY 2018-2023 CIP . Funding for this project is allotted in the city's capital improvement plan for design Fiscal Year 2018/19, -2019 and for construction Fy 2019-2021. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2019/2021 The Transportation Division was awarded an MTIP/RFFA grant to complete the improvement of Cleveland from Burnside to Stark providing pedestrian and bicycle connections as well as adding a continuous median turn lane, drainage and street lighting. The project is located in the North Central and Central City Neighborhood Districts. SDC project #45

Final Planning

Roads / Highways

$4,188,186.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
4
Bidding Soon
657
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.