BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2019 at 8:00 PM

Updated September 15, 2023

Renovation of a stadium in Fort Washington, Maryland. Completed plans call for the renovation of a 47,000-square-foot stadium.

As of March 25, 2019, subcontractor bidding took place in March 2019. The construction manager is no longer accepting subcontractor pricing or inquiries. The Project consists of the demolition of the existing ice facility and the construction of a new ice facility and associated site work on the same general site. The new facility will have one NHL ice rink and associated support and accessory spaces. The area will be approximately 47,000 gross square feet. There is an add alternate to add a second NHL ice rink and additional locker rooms and support spaces as indicated on the drawings. If the add alternate is accepted, the area for the entire building would be approximately 77,200 gross square feet. Estimated Start: 06/10/2019 Construction Duration: 14 Months Taxes: Yes, Include all applicable taxes Wage Scale: No Other Requirements: N/A **Closed Construction Manager solicitation included below for reference only** The Maryland National Capital Park andPlanning Commission desires to contract with an experienced and qualified Construction Manager at Risk ("CMAR") contractor for the construction of a new Tucker Road Ice Rink, 1770 Tucker Road, Fort Washington, Maryland 20744. This Request for Qualifications (RFQu)is the first part of the two-part procurement. The Tucker Road Ice Rink was an approximately 40,700 square foot,stand-alone one story facility that included one sheet of ice (28,000 s.f.). In December 2016, the rink enclosure experienced a substantial fire that caused major damage to not only the rink but to the support areas building. M-NCPPC is committed to demolishing the existing facility and constructing a new indoor ice rink that will generally contain the same facilities as the original structure.The construction budget for this projectis $10-$15 million. Note:No monetary award will be made as part of this RFQu.

Award

Arenas / Stadiums

$15,000,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
465
Active Projects
165
Bidding Soon
3,001
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2019

June 18, 2019

Project location map

1770 Tucker Rd, Fort Washington, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.