BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2024 at 8:00 PM

Updated June 21, 2024

Site work, paving, outdoor lighting and new construction of a mixed-use development in Washago, Ontario. Conceptual plans call for the construction of a playground / park / athletic field; recreation facility; and for site work for a playground / park / athletic field.

Redevelopment of the existing Washago Centennial Park in the Township of Severn is located on the shores of Lake Couchiching and the gateway to the Trent-Severn Waterway. The park makes up 21 acres of public parkland in Washago and includes a peaceful picnic area, playground, pavilion, ball diamond and dog park. Boat launching is also available at the Municipal Dock located at the end of Quetton Street. The scope of work includes; , interior and exterior; Ensure existing hydro and water stations in former camping spots are operational and to code. Improve connecting links for; trail usage, existing canoeing and paddling routes. Improve existing look-out platforms for AODA compliance; slope of ramp, handrails, pathways up to the ramps; Create a multi-use area using existing space to host special events, ball diamond infield or outfields; parking improvements; Lighting improvements that will include, Exterior LED where not already completed, sports; lighting on diamonds, Interior, LED. Consideration to Dog Park improvements, add elements keeping maintenance into consideration. Storage garage on site to be renovated; roof, side walls, if internal structure sound, doors upon examination, electrical to code; All geo-technical services and topographical mapping costs to be included. TIMELINE: Construction on the site was completed in prior phases. Coverage of this report is discontinued. *The owner is proceeding with individual projects as capital funding is allocated. Projects that have gone to tender are followed separately. They include a playground replacement at Coldwater Fairgrounds, AODA Pathway improvements, and Washroom improvements.

Project Abandoned

Playgrounds / Parks / Athletic Fields

Public - City

New Construction, Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
302
Active Projects
150
Bidding Soon
2,316
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2025

Project location map

3398 Quetton St, Washago, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.