Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving, new construction, renovation and addition to a mixed-use development in Santa Monica, California. Completed plans call for site work for a playground / park / athletic field; for the addition of a fitness / recreation center; for paving for a sidewalk / parking lot; sidewalk / parking lot; playground / park / athletic field; and fitness / recreation center.
**Construction start date is estimated to be on January 2021, with completion early 2023. The City of Santa Monica seeks a well-qualified design-build team that represents all necessary disciplines to design and construct the first of three phases for the extension and redevelopment of recreational facilities at Memorial Park in Santa Monica, California. The last day to submit requests for clarification is December 2, 2019 The layout reflects the inclusion of many and varied park program elements within fixed site constraints and the large spatial requirements of programs such as sports fields and other amenities highly-desired by the community, including parking, tennis/pickleball courts, and a community recreation center. To achieve these objectives, the parks footprint will be expanded into portions of 16th Street and Colorado Avenue. Located at 1401 Olympic Boulevard, the 10.3-acre Memorial Park's current offerings include include baseball fields, tennis courts, and a skate park. Under the proposed master plan, designed by AHBE|MIG, the green space would be expanded onto the adjacent Fisher Lumber property, which spans Colorado Avenue between 14th and 16th Streets. Upon completion, Memorial Park would span 13.2 cares, just south of the Expo Line's 17th Street/SMC Station. The rebuild and expansion of the park would occur in three phases, at a cost that could range as high as $116 million. The first, budgeted at between $25 million and $30 million, would include clearing the Fisher Lumber site, as well as the existing tennis courts, parking lot, children's playground, restrooms, and concession stand. This would be followed by the construction of a new community hub building, four combination athletic fields, a baseball practice field, a 128-car surface parking lot with four rooftop tennis courts, and a replacement playground. Construction would occur over a period of 18 to 24 months. The project's second phase would focus on the southeast corner of the park. The existing little league field would be demolished, making way for three new baseball and softball fields. Additionally, the existing skate park would be renovated and expanded, and new exercise stations and a walking trail would be constructed around the park. Phase two would be built over a period of 12 to 18 months, with costs ranging between $15 million and $18 million. The final phase of the master plan, budgeted at $60 million to $68 million, would consist of rebuilding Memorial Park's Community Recreation Center. Construction would occur over a period of 24 to 30 months. Santa Monica is providing public viewings of the master plan materials at two upcoming events: Info Booth with City Staff Saturday, June 1, 2019 10am-2pm, Memorial Park Presentation to Field Sports Advisory Council Thursday, June 6, 2019 7pm, Virginia Avenue Park, Patio Room Consideration by the Santa Monica City Council is expected in August 2019. As of July 23, 2019, a master planner has been selected. Consideration by the Santa Monica City Council is expected in August 2019. A timeline for construction has not been determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. Bids may be rejected if they show any alteration in form, additions not called for, conditions or alternative Bids, incomplete Bids or irregularities. The City reserves the right to reject any and all Bids. Request for Bid (RFB) issued November 13, 2019 Pre-Bid Conference November 25, 2019 Deadline for Requests for Clarification December 2, 2019 Bids due December 9, 2019 Award of Contract January 28, 2019 Schematic Design March 2020 June 2020 Design Development June 2020 October 2020 Submit GMP November 2020 Construction Documents October 2020 March 2021 Construction Phase 1A January 2021 December 2021 Construction Phase 1B January 2022 December 2022
Award
Playgrounds / Parks / Athletic Fields
$1,969,023.00
Public - City
Addition, New Construction, Paving, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 23, 2019
January 4, 2021
1401 Olympic Blvd, Santa Monica, CA
Related To This Project
Santa Monica, CA
--
Santa Monica, CA
Bid Date: Sep 15 2022
Santa Monica, CA
--
Santa Monica, CA
--
Santa Monica, CA
--
Santa Monica, CA
--
Santa Monica, CA
--
Santa Monica, CA
Bid Date: May 25 2022
Santa Monica, CA
--
Santa Monica, CA
Bid Date: Aug 19 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.