BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2019 at 7:00 PM

Updated December 17, 2024

Demolition, site work and new construction of an office development in Minneapolis, Minnesota. Completed plans call for the construction of a 382,000-square-foot, 11-story above grade office development.

Demolition began on June 18, 2018 and construction on the new office began in late September 2018. The building will open in 2020. A parking ramp at 501 Fourth Ave. S. in downtown Minneapolis will be torn down to make way for a 10-story, 382,000-square-foot office tower. The city hopes to achieve Leadership in Energy and Environmental Design Gold-level certification for the new building. LEED Gold is the U.S. Green Building Council's second-highest certification level for resource-efficient buildings.

Under Construction

Office

$150,000,000.00

Public - City

Demolition, LEED Certification, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
146
Bidding Soon
1,560
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.