BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 22, 2025 at 8:00 PM

Updated March 23, 2025

Site work, paving and outdoor lighting for a mixed-use development in Mesa, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

The Val Vista Drive Improvement Project (US 60 to Pueblo Avenue) consists of full street improvements along Val Vista Drive from US 60 to Southern Avenue replacing pavement, curb, gutter, sidewalk, pavement markings, and signage. New vehicle travel lanes and bike lanes will also be constructed. Pavement rehabilitation work (resurfacing) along Val Vista Drive will occur from Southern Avenue to Pueblo Avenue. New City utility lines will be constructed in Val Vista Drive for storm drain, street lights, and gas. New traffic signal improvements will take place at three (3) locations along Val Vista Drive. Landscaping, Gas SCADA System upgrades, and other miscellaneous improvements will be constructed as required. Similar improvements will occur along Southern Avenue from 32nd Street to 37th Street. Sewer rehabilitation work (COM Project No. CP0956SR18) is part of the scope of work and will take place along Val Vista Drive from Coralbell Avenue to Baseline Road. The Engineer's Estimate range is $20,000,000 to $22,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. For all technical, contract, bid-related, or other questions, please contact Stephanie Delgado at Stephanie.Delgado@mesaaz.gov Work shall be completed within 450 consecutive calendar days, beginning with the day following the starting date specified in the Notice to Proceed. The successful bidder, simultaneously with the execution of the Contract, will be required to furnish a Payment Bond in the amount equal to one hundred percent (100%) of the Contract Price, a Performance Bond in an amount equal to one hundred percent (100%) of the Contract Price, and the most recent ACORD Certificate of Liability Insurance form with additional insured endorsements Work shall be completed within 450 consecutive calendar days, beginning with the day following the starting date specified in the Notice to Proceed. Addendum #1-#3 have been issued as of 3-4-2025.

Bid Results

Roads / Highways

$13,189,547.00

Public - City

Outdoor Lighting, Paving, Site Work

155

26

7

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
50
Bidding Soon
1,277
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.