BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

New construction of a fire / police facility in Baraboo, Wisconsin. Design plans call for the construction of a fire / police facility.

As of June 26, 2023, an architect has been selected and this project is in the design development phase. It is anticipated bidding will commence in Dec/Jan 2024, with construction starting in spring 2024. *The closed solicitation has been included below for reference: The Baraboo Fire Department is the sole occupant of the former City Hall building at 135 4th Street. Last year, the City's Police Department and General Administrative Offices vacated that building and moved to the new Municipal Building at 101 South Blvd. The former City Hall building, which was constructed in 1967, replaced the original 1927 City Hall building on the same site. The fire apparatus bay was added to the original City Hall building in 1957. To satisfy the need for additional space, the neighboring building was purchased in 1979 and the open space between them was enclosed. These combined buildings, together with a couple of subsequent additions to the rear of these buildings for the Fire Department is what exists today. The Fire Department also occupies approx. 1,000 sq ft of the adjacent Alma Waite Annex at 120 5th Street. Baraboo District EMS currently occupies two buildings. The Alma Waite Annex at 120 5 th Avenue is a 50' x 112' building and approx., 4,600 sq ft of which is used by Baraboo District EMS of vehicle/equipment storage, offices, dayroom, and sleeping quarters. Their Administrative Offices are located across the street in the building at 121 5th Street that was originally built as a single-family residence in 1940 that has since been converted to approx. 2,800 sq ft of office space. The City has reviewed financing options for this project based on an anticipated cost of $9 Million to $12 Million, which must includes all "soft" and "hard" project costs. The City intends to fund this project through a long-term loan with the USDA.

Design

Fire / Police

$25,000,000.00

Public - City

New Construction

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
28
Bidding Soon
533
All Active Projects
235
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2024

img_map_placeholder

To Be Determined, Baraboo, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.