BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in Henderson, Nevada. Conceptual plans call for the construction of a municipal facility; and for site work for a municipal facility.

As of August 27, 2024, this project is in the conceptual phase. It is anticipated design will begin late fall/early 2025. A firm timeline for construction has not been determined. This project is included in the FY 2025-2030 CIP. A sustainably designed new visitor center for the Bird Viewing Preserve to be located northeast of pond 8 and include indoor/outdoor flexible interpretive and exhibit space, a large classroom/multi-purpose space that can be divided into two smaller spaces, a lobby/information desk, retail area, library, restrooms, staff space to include offices, break area, restroom, storage and cart storage. Site work will include a drop off area near the building, an entry road, parking lot for approximately 75 spaces plus bus parking, signage, lighting and landscape. A conceptual study was done in FY17 to determine scope and estimate of probable costs. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Municipal

$9,900,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
14
Bidding Soon
386
All Active Projects
138
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2025

img_map_placeholder

To Be Determined, Henderson, NV


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.