BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2025 at 8:00 PM

Updated March 14, 2025

Site work for a water / sewer project in Glendale, Arizona. Conceptual plans call for site work for a water / sewer project.

Update:https://tinyurl.com/bdhwfue5 Assess and rehabilitate 99th Ave interceptor manholes and interior lining. Glendale's share of total cost is based on ownership of 71%. Epcor repays 21% of Glendale share for Sun City use. Project is included in City of Glendale - Engineering Fiscal Year 2025-2034 Page no 692 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Rehabilitate portions of the interceptor and related manholes as determined by the Sewer Condition Assessment Study conducted by Project Engineering Consultants. The 99th Avenue interceptor line is the final collector to deliver influent to the 91st Avenue Wastewater Treatment Plant. Glendale owns 70% equity in the line. Additionally, sampling station GL02 will be rehabilitated. As of January 22, 2024, this project is currently in the FY 2024-2033 CIP. Information regarding engineer and architect have not been disclosed. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$500,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
28
Bidding Soon
1,194
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

N 99th Ave, Glendale, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.