Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Fort Chipewyan, Alberta. Design plans call for site work for a road / highway; and for paving for a road / highway.
Construction of a 4-lane divided arterial, approx. 9 km long (between Tomlinson St., and West Airport Boundary Rd.) parkway, connecting the lower town site to the Saline Creek plateau including reconstruction/realignment of the Draper Road. Stage 1 includes full earthworks including tree clearing, earth cut and fill, grading, erosion protection, storm pond grading and outfalls and environmental mitigation. This stage will include the construction of an eight metre wide gravel road on the subgrade to provide interim access; and reconstruction of the Draper Road (1-3 years to complete). Stage 2 includes construction of a 2-lane undivided urban cross section roadway for Saline Creek Parkway. Work will also include paving of a multi-use trail, storm sewer installation for the parkway and roadway lighting (up to 2 years to complete). Stage 3 Final construction work to complete the 4-lane divided cross section of the parkway. TIMELINE: Project is on hold at the owner. Schedules for tender and construction are unknown at this time. Further update may be available in 2024. Total cost for this project is estimated at $146M. Value listed reflects the total cost estimated for Stage 1 (includes design & contingency).
Design
Roads / Highways
$94,000,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 18, 2026
Saline Creek Pkwy, Fort Chipewyan, AB
Related To This Project
Fort Chipewyan, AB
--
Fort Chipewyan, AB
--
Fort Chipewyan, AB
Bid Date: Feb 15 2023
Fort Chipewyan, AB
--
Fort Chipewyan, AB
Bid Date: May 10 2023
Fort Chipewyan, AB
--
Fort Chipewyan, AB
Bid Date: Jun 23 2023
Fort Chipewyan, AB
--
Fort Chipewyan, AB
Bid Date: Apr 18 2019
Fort Chipewyan, AB
--
Fort Chipewyan, AB
Bid Date: Oct 12 2021
Fort Chipewyan, AB
Bid Date: Nov 09 2021
Fort Chipewyan, AB
Bid Date: Apr 27 2020
Fort Chipewyan, AB
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.