BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and renovation of an educational facility in Williamsburg, Virginia. Completed plans call for the construction of a 124,000-square-foot educational facility; for the renovation of a 10,000-square-foot educational facility; for site work for a educational facility; and educational facility.

As of January 12, 2022, this project's funding was delayed again. Project is now expected to bid to prequalified subs and suppliers summer 2022 and start fall 2022. PLEASE NOTE: ThIS general contractor intends to bid to subcontractors who were previously pre-qualified. Bidding information may not be disclosed to planrooms. Direct any inquiries on how to pre-qualify for this and future projects to the general contractor. Or visit:https://partners.skanska.com/usa/teams/DocuPro/SitePages/Prequal%20Inquiry%20Request.aspx/ As of May 20, 2021, this project has received state funding and the design is now continuing thru the end of 2021. Construction is expected to start spring 2022. REMINDER: Only subcontractors and suppliers who are prequalified will receive notice of bid packages. As of July 13, 2020, this project is on hold as funding was not in the current state budget. If funding is available for 2021, design will resume and this project will start construction fall 2021. _____________ This project constructs a 124,000 gsf multi-function teaching and research facility. This is phase four of the Integrated Science Center complex & it will be built on the former Millington Hall site. The project will also renovate 10,000 gsf of existing science center facilities to enable the connection to the existing and adjacent ISC1 building. ISC4 will accommodate Mathematics, Computer Science, Kinesiology and the new undergraduate program in Design & Engineering. Upon completion, science disciplines will be in conjoined space designed to promote state & university STEM initiatives by creating cutting edge laboratories and teaching spaces for instruction and research. Approximate construction cost is $50M-$70M. The facility will be designed to achieve LEED certification. Only Class A, VA licensed contractors considered. Building of such type will need to accommodate cellular and molecular research labs which include fume hoods, bio safety hoods that recirculate air through a HEPA filter with charcoal, natural gas for Bunsen burners and proper HVAC systems to handle large heat loads from devices such as refrigerators and freezers.

Award

Educational

$73,000,000.00

Public - City

LEED Certification, New Construction, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
86
Bidding Soon
1,535
All Active Projects
645
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 17, 2018

September 12, 2022

img_map_placeholder

200 Stadium Dr, Williamsburg, VA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.