EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 20, 2021 at 7:00 PM

Updated October 1, 2024

Demolition, site work, paving, outdoor lighting and new construction of a civil project in Milford, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; water / sewer project; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; and bridge / tunnel.

For the Rehabilitation and Improvement of a Certain Section of State Highway, Bridges and Concrete Culverts in Pike County, Dingman and Milford Townships, Commonwealth of Pennsylvania, State Route 0084, Section 494. The Project Being Situated as Follows: West Bound Sr 0084, Pike County- From Sr 0739 Approximately 5.6 Miles East to Segment 0401 Offset 1355 (Station 496+30) Wb to a Point Approximately 8 Miles West From Matamoras at Segment 0465 Offset 0342 (Station 825+00) Wb, for a Length of 32,670 Feet (6.188 Miles). East Bound Sr 0084 Pike County- From Sr 0739 Approximately 5.6 Miles East at Segment 0394 Offset 2304 (Station 479+60) Eb to a Point Approximately 8 Miles West From Matamoras at Segment 0460, Offset 2253 (Station 822+00) Eb, for a Length of 34,040 Feet (6.447 Miles). Also, Sr 2009 Pike County - Segment 0170 Offset 2079 (Station 11+05) to Segment 0180 Offset 0706 (Station 22+15). For the Reconstruction of an Existing 24 Foot Rural Interstate Roadway, East Bound and West Bound, Consisting of Excavation, Superpave Wearing Course 1 1/2 " and 2" Depth, Superpave Binder Course 2 1/2 " - 3 1/2 " Depth, Superpave Base Course 6" - 8" Depth and Subbase 6" and 8" Depth, Drainage, Guiderail, Fencing, Temporary Concrete Barrier, Concrete Curb, Landscaping, E & S Control Measures, Temporary Traffic Control, Temporary Highway Lighting/ Poles, Signing, Delineators, Pavement Markings, Bridge/ Culvert Removal, Concrete Repair Work. Also, Embankment Work, Six (6) Single Span Comp P/s Bulb-tee Beam Bridge Replacements, Five (5) Concrete Culvert Replacements, Two (2) Concrete Culvert Preservations and Other Miscellaneous Construction Work All Contained Within an Overall Project Length of 34,040 Linear Feet (6.447 Miles) East Bound and 32,670 Linear Feet (6.188 Miles) West Bound as Indicated on the Approved Drawings Included in the Bid Package. Project Cost Range: $70,000,000.00 - $79,999,999.99 Federal Project Status: Federal Oversight Structure Work: 17.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Reconstruction All inquiries must be submitted electronically to ECMS, Do not contact the owner or engineer contacts. PennDOT - I-84 E and W I-4R MP 40 - E46 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$86,283,767.00

Public - State/Provincial

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

628

104

76

6

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Contract Modification Procedures, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Access Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Structural Concrete, Post-Tensioned Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Plaques, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds, Multiple Seating, Pews and Benches, Benches
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Central Heating Equipment, Furnaces
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection, Waterway Construction and Equipment, Waterway Scour Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
438
Active Projects
265
Bidding Soon
4,204
All Active Projects
1,886
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2021

January 24, 2022

img_map_placeholder

I-84, Milford, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

I-84 E&W I-4R MP 40 - E46

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.