Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Hazle Township, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.
The SR 0424, Section 390 project involves an extension of SR 0424, commonly referred to as the Hazleton Beltway, from the I-81/Exit 141 Interchange to Humboldt Industrial Park (HIP) in Hazle Township, Luzerne County. The approximately 1.1-mile long extension will involve the construction of a four-lane roadway from the current termination of the beltway just west of I-81 to Commerce Drive. The roadway will require an at-grade railroad crossing and provide access to the White Birch Road extension directly south of the railroad. Traffic will proceed onto Commerce Drive, Forest Road, and this newly-constructed White Birch Road, a two-lane road to Maplewood Drive, which connects to SR 0924. Turning lanes will be added to the intersections of SR 0424 and I-81 northbound ramps, SR 0424 and I-81 southbound ramps, SR 0424 and Commerce Drive, and Commerce Drive and Forest Road. This extension will ultimately connect the Hazleton Beltway to SR 0924 west of I-81, utilizing HIPs existing roadway network. There are two existing bridges over I-81 within the project limits, SR 0424 at Interchange 141. The existing bridges are 60 wide and striped for three (3) lanes. To facilitate five (5) lanes, the existing bridge cross slopes will be modified to move the profile grade point and the lanes restriped. This will be done with a latex modified concrete overlay (LMCO) of the existing bridge decks. The proposed typical section will result in five (5) 11-0 lanes with two (2) 2-6 shoulders. Modifications to the bridge approach slab will also be necessary. The existing approach slab width is designed to match the current travel lane width on the bridges. With the addition of lanes, the proposed roadway will require wider approach slabs. Approach shoulders will also be modified to concrete and flared to match the radius of the intersection. Three bioretention basins will be used to control stormwater volume throughout the project. The overall project length of 1.771 miles (9,350 linear feet) plus Ramps and Township Roads as indicated on the approved drawings included in the bid package. Project Cost Range: $20,000,000.00 - $24,999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 5.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge All inquiries must be submitted electronically to ECMS, Do not contact the owner or engineer contacts. PennDOT - Ext of 424 to SR 924
Award
Bridges / Tunnels
$16,895,395.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 19, 2021
April 5, 2021
PA-424, Hazle Township, PA
Related To This Project
Hazle Township, PA
Bid Date: Dec 03 2024
Hazle Township, PA
Bid Date: Oct 01 2020
Hazle Township, PA
Bid Date: Oct 23 2024
Hazle Township, PA
Bid Date: Oct 15 2024
Hazle Township, PA
Bid Date: Sep 25 2024
Hazle Township, PA
Bid Date: Aug 16 2024
Hazle Township, PA
--
Hazle Township, PA
Bid Date: Jul 11 2024
Hazle Township, PA
Bid Date: Jun 21 2024
Hazle Township, PA
--
Hazle Township, PA
--
Hazle Township, PA
Bid Date: Apr 02 2024
Hazle Township, PA
Bid Date: Feb 20 2024
Hazle Township, PA
Bid Date: Nov 13 2023
Hazle Township, PA
Bid Date: Oct 24 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.