Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a bridge / tunnel in Mountain Top, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
For the improvement of a certain section of STATE ROUTE 309, Sec D56 in LUZERNE COUNTY, DALLAS TOWNSHIP. The location of the project is as follows: From a point approximately 0.59 miles North of the intersection with SR 415 at Segment 0770 Offset 1165 to a point approximately 0.79 miles North of the intersection with SR 415 at Segment 0770 Offset 2205 along SR 309, Dallas Township. The proposed structure rehabilitation work includes: Reinforced Concrete Repair Type 2 inside the existing box culvert; excavation of the existing box culvert to remove and replace the top slab and the headwall for the last five feet at culvert outlet; removal of portions of the existing wingwalls at the culvert outlet; construction of a reinforced concrete cast-in-place end section at the culvert outlet; placement of waterproofing membrane on top of the existing/ proposed top slab of the box culvert; epoxy injection crack sealing; clearing and grubbing of the existing roadway embankment above the headwall to remove trees and vegetation; channel clearing of all debris and vegetation to restore free flow; and placement of intrusion grout bags, Class C Cement Concrete, and Selected Borrow Excavation Rock, Class R-6 to fill an existing scour hole and prevent further erosion and undermining of the structure. Construction will be completed using half-width staging to maintain traffic and temporary construction easements will be required at all four corners of the bridge. The traffic control during construction will be staged half width construction. All work contained within an overall length of 940 linear feet (0.178 miles) as indicated on the approved drawings included in the bid package. Project Cost Range: $500,000.00 - $999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 28.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: BRIDGE RECONSTRUCTION 408 Version: 2020-5 PennDOT - PA 309 over Br Fern Creek *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Bridges / Tunnels
$718,035.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 26, 2023
March 13, 2023
PA 309, Mountain Top, PA
Related To This Project
Mountain Top, PA
--
Mountain Top, PA
--
Mountain Top, PA
Bid Date: Apr 27 2023
Mountain Top, PA
--
Mountain Top, PA
--
Mountain Top, PA
--
Mountain Top, PA
--
Mountain Top, PA
Bid Date: Mar 02 2023
Mountain Top, PA
--
Mountain Top, PA
--
Mountain Top, PA
Bid Date: Sep 21 2022
Mountain Top, PA
--
Mountain Top, PA
Bid Date: Apr 20 2022
Mountain Top, PA
Bid Date: Jul 28 2022
Mountain Top, PA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.